CHG Engineering Send your drawings
4.811 Google reviews

Quality and inspection in Somerset West

Parts checked against your drawing before dispatch, under internal manufacturing and inspection procedures.

Send us your drawings
Round aluminium ring with concentric grooves, pockets and drilled bosses
Inspection
In-house CMM
Supplier status
Audited by customers
CNC milling and turning
to 0.02 mm
Finishing
Clean room
Square aluminium structural panel with a central opening, ribs and weight-relief pockets

How every part is checked before dispatch

From machining and fabrication to finishing and inspection, every part follows a controlled process before it leaves our workshop.

Dimensional checks are done on our own CMM. The inspection coverage and the documents you need are agreed during the technical review.

  • Measured to your drawing

    Critical dimensions, hole positions, depths, bores and key features are checked against your drawing, with reports available when required.

  • First-off approval

    Prototype and first-off parts are inspected before the full batch continues.

  • Finish checked to specification

    Blasting, coating and other finishing requirements are checked to the specification provided.

  • Ready for delivery

    Parts are cleaned, protected and released with the required documentation where needed.

Coating tests, on paper

The tests your specification calls for, on the coatings we apply.

  • DFT and WFT

    Dry and wet film thickness on the coatings we apply.

  • Pinhole testing

    Checks for pinholes in the coating.

  • Cross-hatch adhesion

    Adhesion tests on the coatings we apply.

  • Certificate of conformance

    The results of the tests you specify, on paper.

What a supplier-quality team should know

What to know before you add us to your supplier list.

  • A quality management system

    Internal manufacturing and inspection procedures.

  • Approved by our customers

    An approved supplier to customers in established aerospace-sector quality systems, with experience of customer supplier audits.

  • A clean room for aerospace finishing

    Bead blasting, brushing and cosmetic surface finishing in a clean room.

  • Not independently certified

    We are not ISO 9001 or AS/EN 9100 certified. Supplier qualification, traceability and programme requirements are agreed before we accept an RFQ.

Industries we work forAerospaceMedicalMarineMiningAutomotiveWine

From enquiry to approved parts

A straightforward process for prototypes, small batches and repeat production.

  1. Send your drawings

    Send us your drawing, model or part requirements for review.

  2. Technical review

    We review the drawing, material, tolerances, finish and inspection requirements.

  3. Quote & lead time

    You receive a quotation, estimated lead time and any technical feedback.

  4. First-off approval

    Where required, a first-off sample or trial part is approved before batch production starts.

  5. Production & delivery

    Once approved, we manufacture, inspect and prepare the parts for delivery.

What customers say about the work

Lighting fast service, I was really impressed by their quality!

Francois Du Toit

Good client service and good comunication through out the job. definitely recommend C H G to others.

jacques joubert

Read them on Google (opens Google)

Before you send an RFQ

What should an RFQ include?

The drawings, quantity, material, finish and any inspection requirements, plus the documents your programme needs.

Do you take prototypes and one-offs?

Yes. We quote prototype, development and repeat-production work, subject to technical review and capacity.

How long do quotes and jobs take?

It depends on the part's complexity, material availability and technical requirements, so every quotation gives its own estimated lead time.

Send us your drawings

Attach the drawings, add the quantity, material and finish, and we'll review them for a quote.

    We use these details only to answer your request. Privacy

    Find us in Somerset West Business Park

    The factory and office are in Unit 2.